-
How to attach an obsolete card to existing card Navigate to Project Menu > Cards > Obsolete Cards Step … Obsolete Cards grid. … file on the card.
-
Edit Data in the Grid To begin, filter the card list to display only the cards you wish to apply changes … DocBoss allows users to make changes to existing data in the Card List in bulk through two different … If you already have cards set up on the project they will be populated in the CSV file.
-
When DocBoss auto-generates cards (based on your selected level), cards will be created for ALL equipment … If a card includes ANY unit which satisfies the query, the card is marked as required. … When certain cards are not required, you need to tell DocBoss which cards SHOULD be left on the order
-
Card XYZ will appear. … CARD DEF: 1 linked unit (unit 3) If you change the model number on unit 3 from DEF to XYZ, then CARD … If it DOES go to OBSOLETE: Old cards can be re-attached to the new ones from the Obsolete Cards grid.
-
To resolve card to unit changes, see Process Card to Unit Changes . … DocBoss shows cards on the Card to Unit Changes screen when a user changes or adds a new equipment value … for those cards, AND the cards: have a file (active, or in their history), and have a doc code with
-
Last Updated: 07/11/2025 in Articles Library
Manually To manually assign published documents to a card, navigate to the card list. … Attach a published document to a card Attaching a published document to a card can either be done manually … For the appropriate card, click the attach (paper clip) icon under "Tools."
-
the export by card name or ID. … , the history record of all cards can be exported. … Below the SDI Reports grid, the "Card History Export" option is available.
-
Last Updated: 04/30/2026 in FAQ General FAQ
card(s) If a card includes multiple equipment units but you receive documentation with these tags separated … To manually adjust the equipment units included on a card, follow the steps below: Open the card edit … Option 3: Manual adjustment If neither splitting or merging cards will result in the card configuration
-
second card will become the "Active" card. … To split a card, navigate to the card list and click the split icon under "Tools." … Once saved, all dsX cards created via splitting will show in the card list.
-
Last Updated: 12/26/2025 in Articles Getting Started
Delete Card Deletes the card. … Split Card Separates an auto-generated card into two (or more) separate cards when the equipment/tags … *Note - Only available for manually-created card (i.e., manual cards, copied cards, and sheets).
-
To edit the routing of a card, navigate to the card list ( Project Menu > Cards > Card List ) and click … From the drop-down, you can quickly re-route the card to the same person to review the card again. … TIP: If cards are typically routed to the same individual(s), routing scenarios can be applied to cards
-
Usually when a copy or sheet is created from a card, the new card is expected to be a different, but … This returns the file and history to the original card, without affecting the new card. 9. … or card name to find the match).
-
To access card history, navigate to the card list, and click the history icon. … Once exported, the data can then be filtered by card. … The history record of all project cards can be generated quickly and easily.
-
The Overdue Cards Report is an internal tracking tool that users can enable from their profile. … If you do not see an "Overdue Cards Report" template in your system, please reach out to the support
-
Users may want to assign the card to a specific user, responsible to upload that card. … All cards of the code will receive the same action defaults. … Every time a new workflow stage begins, a card is set to NULL status (exceptions exist, but are not typical
-
To create a custom doc code/card field, navigate to A dmin > Customization > Doc Code/Card Fields. … You can add custom fields to your cards. Here's how to create and manage them. … Create The initial set up of custom doc code / card fields must be done by an Admin User.
-
1 of 1 if only one Card). … "Sheet Adder" was created to allow users to count the number of sheets on the Manual Cards (i.e. sheet … Under the "Main" tab, expand the "Other Settings" section and set the "Display sheet adder for manual cards
-
You can define an assignment for all cards which come back either as COMPLETE, or INCOMPLETE. 1. … In this case, once assigned, users shall complete the action in order to set final status to the Card … Review COMPLETE cards (before completing stage) If users set values for “Review before completing stage
-
Last Updated: 09/18/2024 in Articles Projects Project FAQ
situations: Red - If expected return of card is after due date. … The system will also color a row red if the Action Due Date is after the Card Due Date. … Default Grid Row Colors There are two default grid colors that will appear in the Card List in the following
-
Filtering on the Multi-Project Card Report screen uses the same layout. … The walkthrough shown below uses the Card List to illustrate filtering options. … Manual search is useful if you are working with a very large card list and notice slow loading speeds