-
From the popup, select the card(s) to be voided from the submittal (1), and click Void (2).
-
Last Updated: 08/01/2024 in Release Notes Older Releases
DocBoss now allows users to expedite overdue cards from any project to any of the following groups (targets
-
same as the tag numbers they could be easily matched in bulk process by DocBoss with the auto-created card
-
To send documents via an Ad-Hoc submittal:
Step1:
Navigate to the cards list, and select the documents
-
project has been set up with the required information (Doc Codes with Levels and Equipment) and the cards … directly on the grid
$ per doc (mgmt fee): Automatically calculated based on the total number of cards … DocBoss automatically determines how many documents should be billed, based on the card and the manufacturer
-
If Static selection is checked, users select each project to add to the card individually.
-
Example: If Drawing: 4530KR-ISO-0001 -001 If Document: 4530KR-GEN-0001 Enable a custom doc code/card
-
Last Updated: 04/17/2025 in Articles Projects Workflow Stages
To assign a stage list to a doc code, navigate to Project Menu > Cards > Code List.
-
Comment : Reserved for text added at the card level. This text is entered on the Info tab. … Assign a file to a card and once loaded, click the "View markup" box to enable the markup interface Click
-
For information on how to Set eSignature requirements per Doc Code (or card) (Step 2), see our article
-
the grid, click "More Actions," and choose "Bulk Doc Download" to download the file assigned to each card … your user profile ( System Menu > Edit your profile > Permissions ) Once the action is complete, the card
-
Last Updated: 08/01/2024 in Release Notes Older Releases
Grids are available for both cards, and outstanding actions.
-
Last Updated: 09/16/2024 in FAQ General FAQ
This should be created as custom doc/card code columns. … upcoming development items to fully comply with the spec include an option to zip of each document card
-
Stamps can be applied on the document Viewer once the file has been assigned to the Card.
-
Last Updated: 04/17/2025 in Articles Projects Workflow Stages
completion of a stage will either (1) prompt the start of the next stage (if applicable), or (2) set the card
-
Once the appropriate project is selected, navigate to Project Menu > Cards In/Out > Incoming Documents
-
organization's MTR records
No need for document controllers to upload or assign MTRs individually to cards
-
Last Updated: 09/16/2024 in Articles Admin System Setup
still required and/or in use on project or output templates:
Project (Main) Fields
Doc Code/Card
-
Once an initial document is brought in and assigned to a card, the internal approval cycle starts. 1
-
to NDE log: Test/Certificate Number
Set Type to Generated Sub-supplier
Set Stage List to "Hide cards