-
Define which cards are to be included in the Reference you added. … Define which cards are to be included in the new Reference you added. … If we were to issue the IOM by “model” the card would show that we would be providing 3 manuals, and
-
reports (MTRs) stored in the library, the easiest way to automatically attach these to a project's cards … (Note: this step is important as this is what tells DocBoss to search for the library card with the pattern … that matches the card's reference .)
-
Last Updated: 08/01/2024 in Release Notes Older Releases
Project dashboard summaries are now called tiles (vs cards) to avoid confusion with document cards. … Manage Translations
Auto-create (and manage) secondary cards to store translated versions of documents … Reports
New Email report for overdue cards
New Email report for submittals not downloaded by target
-
Sort Cards in Compilation 2. … The system-generated doc code title page includes the doc code name and a full list of the cards contained … For customers who are still working with hard copy's, the compilation cover page is typically inserted
-
Variables
Generally, submittals include multiple cards, therefore variables are restricted to project … See bottom of page if you need to send one email per card, and need document specific variables for the … ONE CARD per one submittal *
Some customers have an automated document processing solution in place
-
Last Updated: 08/01/2024 in Release Notes Older Releases
of the collapsed project card. … Now, if you have set up internal document codes, you can use them to skin the project cards. … Edit data on collapsed card view
Administrators may now edit the data being displayed on all 5 rows
-
Last Updated: 11/05/2025 in Articles Projects
additional flexibility is required Note : Manual cards are typically used for suppliers of equipment … Custom levels can be created if/when needed, and manual cards can be used as an advanced option when … Optional - Add a query to mark cards as required/unrequired Select the codes from the grid that will
-
NOTE: If you are looking for a "Standing Comment" you should enable a custom field for the card . … If any of these variables are included on a template (and a comment is added to the card), the comment … When to add comments Comments can be added during the assign process, directly on the Card through the
-
In the assign screen, after dragging and dropping the file to the card: 1) Enter the number of pages … users can choose to include comment sheets using the checkbox on the outbound submittal grid (for each card
-
Last Updated: 09/16/2024 in FAQ General FAQ
Our searches are heavily centralized on status. the status can be manually updated from the card list … You will lose the customer status field, making it hard to see what work is approved/not approved.
-
Fields & Equipment Types Import (and enable) custom fields, including doc code/card fields , equipment … equipment number, doc code level, stage list, etc.), enabling/disabling certain features (e.g., manual cards … expediting on or off for each target, and configure settings including the format of the report, how the cards
-
Last Updated: 01/12/2026 in FAQ General FAQ
incoming submittals, (b) upload files to pre-existing incoming submittals, and/or (c) assign files to cards … However, reviewer user do have the ability to upload files directly to cards where they have been assigned
-
Last Updated: 02/18/2026 in Articles Projects Workflow Stages
Once a complete status is assigned to a card (i.e., completing the current stage), a different stage … Once saved, the card will move to the first stage of the newly selected stage list (and skip any further
-
Once the section is created, move the entire compilation structure (cards, sections, etc.) into the new … To see specific card details (e.g., doc numbers, etc.), the compilation must be linked to the doc code … These arrays should be used within the and arrays in order to cross-reference card variables with the
-
only apply to cards associated with the sub-supplier selected for the charge. … project has been set up with the required information (Doc Codes with Levels and Equipment) and the cards … Quantity is automatically calculated (based on the total number of cards on the project), but can be
-
Select cards, and initiate submittal Select the documents you wish to send and start the submittal. … For information on how to Set eSignature requirements per Doc Code (or Card) (Step 2), see our article
-
Last Updated: 04/17/2025 in Articles Projects Workflow Stages
Note: Stages added to this library can only be added via the stage list editor on individual cards and … has been added to the library, it can be used when editing the stage list workflow on a particular card
-
Last Updated: 08/01/2024 in Release Notes Older Releases
Card Management
Merge
Copy history when unmerging a card
When a user disassembles a merged card … Now – users can edit merged cards, regardless of whether duplicates have been created. … in the assigned area using the same prefixes which are available on the full card list (i.e.
-
Once a status is assigned and the card(s) is processed, the workflow will continue as defined by the … Once a status is assigned and the card is processed, the workflow will continue as defined by the stage … the grid, click "More Actions," and choose "Bulk Doc Download" to download the file assigned to each card
-
end of the email) and add the "Embed Card List" variable (by selecting it from the gear icon). … In the "Html template" section, click the area that you would like to add the card list (e.g., at the